Character
The Grand Auditorium
OUT OF CHARACTER INFORMATION
- Intent: To create a unique structure for an upcoming storyline
- Image Credit: X
- Canon: N/A
- Permissions: [N/A
- Links: N/A
- Structure Name: The Grand Auditorium
- Classification: Ampitheater, Gathering Hall, Event Stadium
- Location: Bastion
- Affiliation: The Diarchy
- Accessibility: The Grand Auditorium of the Diarchy is located on a small plateau near Bastion's equatorial region. The plateau is only accessible by air or speeder transport, with sheer cliffs on all sides surrounding it.
- Description: The Grand Auditorium is a work of crafted terraforming and architectural wonders. A massive plateau has been crafted in the equatorial region of Bastion, rising nearly a kilometer into the sky. An artificial biome has been nurtured on top of the plateau, with millions of gallons of water constantly being pumped into artificial lakes, before running off in waterfalls that surround the plateau on all sides. Landing pads have been carefully crafted among trees and rock formations, each one meticulously placed to ensure a clear view of the central complex. Multiple viewing podiums have been set around the open center of the plateau, each isolated from the other but all wit views of the center podium held suspended over empty air.
[ What areas within the structure are significant? Give a description of each point listed. ]
SECURITY
Maximum
- Five shield generators have been placed around the perimeter of the complex, each with frequencies set to overlap with one another to ensure maximum protection. Ten secondary generators are set within the primary spire of the complex, capable of being activated should the heavy shield generators on the perimeter fail, though they will only protect the actual Auditorium complex.
- Orbital Weapons to be added
- More to come
HISTORICAL INFORMATION
The Grand Auditorium was crafted by the direct order of the Diarchy's leadership, the brother Diarch's Reign and Rellik. Resources from across the Diarchy's new domain were funneled into the project, with the best architects and ecologists from the region being sponsored to assist with the construction. In a single week, the plateau was raised and the foundations of the Auditorium were complete, and by the end of the first month of construction, the final touches were being made.
Last edited: